Less build. More rehabilitate. Old structures. New uses. More quality. Less waste.
We propose the rehabilitation of an old disused industrial building for the creation of a veterinary hospital with rehabilitation center and outdoor residence for pets. It is a modular project with a high degree of prefabrication and dry construction.
The project is based on an intellectual concept of conception, design and construction that defines rules for the oceanization of processes capable of guaranteeing the qualities of use, operation, construction and maintenance of the center.
Execution time: 12 weeks.
Transportable structures. Minimum waste.